A TURNKEY Removal and rELOCATION OF FILLING AND PACKING LINES
Project scope and execution
In 2017, we were commissioned by a major Food and Drink manufacturer in the East Midlands to relocate two Filling and Packing Lines, including a shared Secondary Packing Line, to a facility in Asia. Acting as Principal Contractor, we delivered the 8-week project in full compliance with CDM Regulations, all while operating within a live food production environment and strictly adhering to the client’s hygiene protocols.

Project Gallery



8 weeks
Project execution
13 containers
Shipped & relocated
100%
Regulatory compliance
Disassembly, packing and logistics
We worked as Principal Contractor, carrying out the 8 week project to CDM Regulations whilst working in a busy Food processing production environment and adhering to the clients strict hygiene regulations. The Line was photographed and marked up before electrically and mechanically disconnected. The machinery was further dismantled into suitable sizes to be shipped by sea freight.
The sections were moved to an internal packing area where they were further marked up and comprehensive packing lists compiled to ensure the stringent import regulations of the destination country were complied with. The machinery and equipment was placed onto timber pallet bases and hermetically sealed in foil bags. The 2 Filling machines: 11.0m x 2.1m x 2.2m, weighting 14,000kgs each; had to be jacked up and a transport frame fitted. The hermetically sealed foil bag had to be designed to fit/seal the machine on its transport frame. The machinery was then moved from the production area and loaded and secured into 13 shipping containers, for sea freight to Asia.
Installation and continued partnership
We were asked to attend the destination site, for a period of 6 weeks, to supervise the installation of the Lines and recommissioning of the lines. The project was completed successfully, resulting in a repeat commission in 2022 to execute a similar relocation—again involving two Filling and Packing Lines and a Secondary Packing Line—back to the same facility in Asia.
Download the case leaflet
get in touch
Do you have our next challenge?
If you’re planning a project that requires the same level of precision, coordination and technical expertise as the one you’ve just read about, we’d be glad to support you. Share a few details through the form below — your timeline, location or specific challenges — and our team will get back to you with clear guidance and a no-obligation proposal. Let’s explore how we can help bring your next project to life just as smoothly.